Roads Assessment for Wind Turbines Transfer to Maysan Provence - Iraq

Authors

  • Auday H. Shaban Department of Physics, College of Education for Pure Science Ibn-Alhaitham, University of Baghdad, Baghdad, Iraq

Keywords:

Roads assessment, GIS, Wind Turbines transfer

Abstract

Wind farm assessment project have several steps. This paper aim on the second step which is harvesting the roads properties from the loading point to the construction point. The difficulties of examining the roads whether they are appropriate or not for transporting wind turbine components. The selected site for establishing wind farm is located at Maysan province and has 262 km distance from Um – Qaser port. The results through applying remote sensing and GIS techniques on Landsat (30 m resolution) and QuckBird (0.6 m resolution) are summarized by (2 hard turn, 18 Bridges that crossing over, and 13 Bridges passing under).

Downloads

Download data is not yet available.

Downloads

Published

2022-04-28

Issue

Section

Physics

How to Cite

Roads Assessment for Wind Turbines Transfer to Maysan Provence - Iraq. (2022). Iraqi Journal of Science, 57(3A), 1867-1875. https://ijs.uobaghdad.edu.iq/index.php/eijs/article/view/7084

Similar Articles

1-10 of 399

You may also start an advanced similarity search for this article.