[1]
“Solving the Multi-Criteria Problem: Total Completion Time, Total Late Work, Total Earliness Time, Maximum Earliness, and Maximum Tardine”, Iraqi Journal of Science, vol. 65, no. 5, pp. 2724–2735, May 2024, doi: 10.24996/ijs.2024.65.5.30.