Solving the Multi-Criteria Problem: Total Completion Time, Total Late Work, Total Earliness Time, Maximum Earliness, and Maximum Tardine. (2024).
Iraqi Journal of Science
,
65
(5), 2724-2735.
https://doi.org/10.24996/ijs.2024.65.5.30