1.
Solving the Multi-Criteria Problem: Total Completion Time, Total Late Work, Total Earliness Time, Maximum Earliness, and Maximum Tardine.
Iraqi Journal of Science
. 2024;65(5):2724-2735. doi:
10.24996/ijs.2024.65.5.30