(1)
Solving the Multi-Criteria Problem: Total Completion Time, Total Late Work, Total Earliness Time, Maximum Earliness, and Maximum Tardine. Iraqi Journal of Science 2024, 65 (5), 2724-2735. https://doi.org/10.24996/ijs.2024.65.5.30.